Transitional HousingCompleted Transitional Housing Projects

Transitional Housing Project at Pok Oi Kong Ha Wai Village (Phase 1 & 2)

Location and Environment

Kong Ha Wai is currently the largest transitional housing development in Hong Kong as well as the biggest residential project to adopt the Modular Integrated Construction (MiC) method. It will provide about 2000 transitional housing units upon completion.

Details

Project NamePok Oi Kong Ha Wai Village (Phase 1 & 2)
Operating OrganisationPok Oi Hospital
LocationKong Ha Wai, Kam Tin, Yuen Long
No. of Units and Households 1,998 units and a total of approximately 6,000 residents
(Phase 1: 781 units)
(Phase 2: 1217 units)
Project Data
  • Newly-built project
  • 8 nos. four-storey domestic blocks and 2 nos. of single-storey and two-storey amenity blocks respectively
  • 1124 nos. 1-2 person units
  • 824 nos. 3-4 person units
  • 50 nos. 5-6 person units or barrier-free units
ProvisionsEach unit will be equipped with a bathroom with toilet and a cooking area.
Funding Scheme Funding Scheme to Support Transitional Housing Projects by Non-government Organisations
(A grant of $1,098.9 million has been approved.)
Date of Commencement of Works Phase 1: 23 March 2021
Phase 2: 1 September 2021
Date of Completion Phase 1: April 2022
Phase 2: December 2022
Date of Intake Phase 1: May 2022
Phase 2: January 2023
Operation Period Estimated to be not less than 5 years
Environment, features, floor/ layout plans, show flats and etc.

Video of the project:

Video of the project


Important Moments

Pre-construction Preparation

Pre-construction Preparation

Pre-construction Preparation

Sample Units of Different Sizes


Sample Units of Different Sizes

Sample Units of Different Sizes

Sample Units of Different Sizes

Sample Units of Different Sizes

Sample Units of Different Sizes

Sample Units of Different Sizes

Sample Units of Different Sizes

The transitional housing project at Kong Ha Wai is developed on a piece of private land, comprising about 97.4% of site, at a nominal rent of one dollar from the Henderson Land Development, whose voices can be found in the following video links (Chinese only):

Video 1
Video 2

For more information about the history and daily life of Kong Ha Wai, please visit the following link (Chinese only):

(1) Life at Kong Ha Wai | Facebook
March 2021 Works Commencement Ceremony

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

Ground-breaking Ceremony officiated by Chief Executive Carrie Lam

October 2021 Press Conference

Announcement of Application Details about Pok Oi Kong Ha Wai Village

Announcement of Application Details about Pok Oi Kong Ha Wai Village

Announcement of Application Details about Pok Oi Kong Ha Wai Village



Visiting Show Flats

Visiting Show Flats

Show Flats

1-2 person units

1-2 person units

1-2 person units

3-4 person units

3-4 person units

3-4 person units

Layout Plans

1-2 person units

1-2 person units

3-4 person units

3-4 person units

5-6 person units or barrier-free units

5-6 person units or barrier-free units

Revised Stereo Conceptual Design

Revised Stereo Conceptual Design

Revised Stereo Conceptual Design

Revised Stereo Conceptual Design

Revised Stereo Conceptual Design

*Note:

1. The operating organisation may from time to time update or change the information of the project, including the eligibility criteria for application, rent level and related services. For latest information of the project, please visit the project website or contact the operating organisation.

2. All map coordinates are indicative only and do not reflect the exact locations.

Back